swarm-support
[Top][All Lists]
Advanced

[Date Prev][Date Next][Thread Prev][Thread Next][Date Index][Thread Index]

Re: Scheduling with a schedule


From: Marcus G. Daniels
Subject: Re: Scheduling with a schedule
Date: 14 Dec 2000 09:58:59 -0800
User-agent: Gnus/5.070084 (Pterodactyl Gnus v0.84) Emacs/20.4

>>>>> "FW" == Fred Wan <address@hidden> writes:

FW> For instance, I want to update 1 out of 10 (otherwise the same)
FW> agents only 1 in 100 times. As I understand it, this should be
FW> solved using different schedules, but if 'real' scheduling (i.e.,
FW> having at least some control over the timeline) isn't possible,
FW> why aren't schedules not called 'sequences'?

How is this different from a Schedule with a repeat interval of 100 having
an Action directed at that agent?

                  ==================================
   Swarm-Support is for discussion of the technical details of the day
   to day usage of Swarm.  For list administration needs (esp.
   [un]subscribing), please send a message to <address@hidden>
   with "help" in the body of the message.



reply via email to

[Prev in Thread] Current Thread [Next in Thread]