[Date Prev][Date Next][Thread Prev][Thread Next][Date Index][Thread Index]
Re: Scheduling with a schedule
From: |
Marcus G. Daniels |
Subject: |
Re: Scheduling with a schedule |
Date: |
14 Dec 2000 09:58:59 -0800 |
User-agent: |
Gnus/5.070084 (Pterodactyl Gnus v0.84) Emacs/20.4 |
>>>>> "FW" == Fred Wan <address@hidden> writes:
FW> For instance, I want to update 1 out of 10 (otherwise the same)
FW> agents only 1 in 100 times. As I understand it, this should be
FW> solved using different schedules, but if 'real' scheduling (i.e.,
FW> having at least some control over the timeline) isn't possible,
FW> why aren't schedules not called 'sequences'?
How is this different from a Schedule with a repeat interval of 100 having
an Action directed at that agent?
==================================
Swarm-Support is for discussion of the technical details of the day
to day usage of Swarm. For list administration needs (esp.
[un]subscribing), please send a message to <address@hidden>
with "help" in the body of the message.
- Grid2D and Notice, David Aliaga, 2000/12/12
- Re: Grid2D and Notice, Marcus G. Daniels, 2000/12/12
- Re: Grid2D and Notice, Marcus G. Daniels, 2000/12/12
- Scheduling with a schedule, Fred Wan, 2000/12/14
- Re: Scheduling with a schedule,
Marcus G. Daniels <=
- RE: Scheduling with a schedule, Fred Wan, 2000/12/14
- Re: Scheduling with a schedule, Marcus G. Daniels, 2000/12/14
- Re: Scheduling with a schedule, Doug Donalson, 2000/12/14
- RE: Scheduling with a schedule, Fred Wan, 2000/12/14
- TestGUISwarm, Fred Wan, 2000/12/19
- RE: TestGUISwarm, Fred Wan, 2000/12/19
- Re: TestGUISwarm, Marcus G. Daniels, 2000/12/19