qemu-devel
[Top][All Lists]
Advanced

[Date Prev][Date Next][Thread Prev][Thread Next][Date Index][Thread Index]

[PULL v2 03/15] gitlab-ci.yml: Allow custom # of parallel linkers


From: Alex Bennée
Subject: [PULL v2 03/15] gitlab-ci.yml: Allow custom # of parallel linkers
Date: Wed, 10 Mar 2021 15:59:50 +0000

From: Daniele Buono <dbuono@linux.vnet.ibm.com>

Define a new variable LD_JOBS, that can be used to select
the maximum number of linking jobs to be executed in parallel.
If the variable is not defined, maintain the default given by
make -j

Currently, make parallelism at build time is based on the number
of cpus available.

This doesn't work well with LTO at linking, because with LTO the
linker has to load in memory all the intermediate object files
for optimization.
The end result is that, if the gitlab runner happens to run two
linking processes at the same time, the job will fail with an
out-of-memory error,

This patch leverages the ability to maintain high parallelism at
compile time, but limit the number of linkers executed in parallel.

Signed-off-by: Daniele Buono <dbuono@linux.vnet.ibm.com>
Signed-off-by: Alex Bennée <alex.bennee@linaro.org>
Reviewed-by: Daniel P. Berrangé <berrange@redhat.com>
Message-Id: <20210304030948.9367-2-dbuono@linux.vnet.ibm.com>
Message-Id: <20210305092328.31792-8-alex.bennee@linaro.org>

diff --git a/.gitlab-ci.yml b/.gitlab-ci.yml
index 8b6d495288..814f51873f 100644
--- a/.gitlab-ci.yml
+++ b/.gitlab-ci.yml
@@ -27,6 +27,10 @@ include:
       else
         ../configure --enable-werror $CONFIGURE_ARGS ;
       fi || { cat config.log meson-logs/meson-log.txt && exit 1; }
+    - if test -n "$LD_JOBS";
+      then
+        meson configure . -Dbackend_max_links="$LD_JOBS" ;
+      fi || exit 1;
     - make -j"$JOBS"
     - if test -n "$MAKE_CHECK_ARGS";
       then
-- 
2.20.1




reply via email to

[Prev in Thread] Current Thread [Next in Thread]