[Date Prev][Date Next][Thread Prev][Thread Next][Date Index][Thread Index]
[taler-anastasis] branch master updated: do not repeat title slide
From: |
gnunet |
Subject: |
[taler-anastasis] branch master updated: do not repeat title slide |
Date: |
Wed, 10 Jun 2020 23:58:20 +0200 |
This is an automated email from the git hooks/post-receive script.
grothoff pushed a commit to branch master
in repository anastasis.
The following commit(s) were added to refs/heads/master by this push:
new 6fd4668 do not repeat title slide
6fd4668 is described below
commit 6fd4668c692f879bcb145604c15993030c603220
Author: Christian Grothoff <christian@grothoff.org>
AuthorDate: Wed Jun 10 23:58:16 2020 +0200
do not repeat title slide
---
doc/thesis/Journal.tex | 49 +++++++++++++++++++++++--------------------------
doc/thesis/thesis.tex | 8 +++++---
2 files changed, 28 insertions(+), 29 deletions(-)
diff --git a/doc/thesis/Journal.tex b/doc/thesis/Journal.tex
index 7a0875c..1fa1a04 100644
--- a/doc/thesis/Journal.tex
+++ b/doc/thesis/Journal.tex
@@ -1,14 +1,15 @@
-\title{Anastasis work journal}
-\date{\today} %% or \date{01 november 2018}
-\author{Dominik Meister (\texttt{dominiksamuel.meister@students.bfh.ch}) \\
- Dennis Neufeld (\texttt{dennis.neufeld@students.bfh.ch })}
-\maketitle
-\clearpage
+%\title{Anastasis work journal}
+%\date{\today} %% or \date{01 november 2018}
+%\author{Dominik Meister (\texttt{dominiksamuel.meister@students.bfh.ch}) \\
+% Dennis Neufeld (\texttt{dennis.neufeld@students.bfh.ch })}
+%\maketitle
+%\clearpage
+
\section{Work journal}
\section*{Meeting 20.02.2020}
Present at the Meeting were:"Dominik Meister, Dennis Neufeld and Christian
Grothoff".
\subsection*{Reflection}
-It was the first meeting of the Bachelor's thesis. The main focus lied on the
planing of the project and discussing the next steps.
+It was the first meeting of the Bachelor's thesis. The main focus lied on the
planing of the project and discussing the next steps.
The conclusion was there is alot of work to do and we need to focus from the
beginning.
\subsection*{Next Steps}
The next meeting will be at the 27.2. Until this meeting drafts of several
project documents should be completed. Task schedule, project document, work
journal, business plan, abstract, motivation. Additionaly a draft for the
BRIDGE funding proposal should be written.
@@ -23,7 +24,7 @@ The next steps are the completion of the BRIDGE proposal.
\section*{Meeting 05.03.2020}
Present at the Meeting were:"Dominik Meister, Dennis Neufeld and Christian
Grothoff".
\subsection*{Reflection}
-In this meeting the main topic was the finalization of the BRIDGE proposal. We
also discussed the related work and Business model of Anastasis.
+In this meeting the main topic was the finalization of the BRIDGE proposal. We
also discussed the related work and Business model of Anastasis.
Through the extensive work on the BRIDGE proposal the development has not
continued very fast. But we already could write key parts for the Bachelor
thesis.
\subsection*{Next Steps}
Next is the completion and delivery of the BRIDGE proposal.
@@ -47,7 +48,7 @@ Completion of the Anastasis Client API tests and continue on
the implementation
Present at the Meeting were:"Dominik Meister, Dennis Neufeld and Christian
Grothoff".
\subsection*{Reflection}
We ran into alot of problems and decided to make more frequent meetings. We
need to fix some design issues, the imports
-of the different files are done wrong. Additionaly we need to be more clear
with the names.
+of the different files are done wrong. Additionaly we need to be more clear
with the names.
We need to focus more on the implementation and be more precise with the
documentation.
\subsection*{Next Steps}
Implementation of the Crypto library, fix issues mentioned.
@@ -55,7 +56,7 @@ Implementation of the Crypto library, fix issues mentioned.
\section*{Meeting 30.03.2020}
Present at the Meeting were:"Dominik Meister, Dennis Neufeld and Christian
Grothoff".
\subsection*{Reflection}
-We could fix the issues from the last meetings and are now in the development
of the crypto library.
+We could fix the issues from the last meetings and are now in the development
of the crypto library.
We had some problems with pointers which we could discuss and fix. We are
happy that we can see progress.
\subsection*{Next Steps}
Implementation of the Crypto libarary, finishing API.
@@ -63,7 +64,7 @@ Implementation of the Crypto libarary, finishing API.
\section*{Meeting 02.04.2020}
Present at the Meeting were:"Dominik Meister, Dennis Neufeld and Christian
Grothoff".
\subsection*{Reflection}
-Dennis is still fixing issues with the API communication, the process is very
time consuming and
+Dennis is still fixing issues with the API communication, the process is very
time consuming and
we are pretty behind. Dominik was sick for some days and was not able to work
for the project. We are now
pretty behind our task schedule and need to work harder.
\subsection*{Next Steps}
@@ -106,8 +107,8 @@ Finish Crypto library testing, implementation anastasis
client
Present at the Meeting were:"Dominik Meister, Dennis Neufeld and Christian
Grothoff".
\subsection*{Reflection}
We still have some bugs in the crypto library. We should focus that the
application
-is not crashing if something unexpected happens, the application should
continue.
-Additionaly there were some security issues in the code we need to fix.
+is not crashing if something unexpected happens, the application should
continue.
+Additionaly there were some security issues in the code we need to fix.
The development of this component is very complex and needs a lot of time, we
hope that we soon can finish the crypto library. Also the development of the
Anastasis
client is finished we can now start with the testing.
@@ -128,7 +129,7 @@ Present at the Meeting were:"Dominik Meister, Dennis
Neufeld and Christian Groth
\subsection*{Reflection}
The testing of the anastasis client api is progressing slowly. We could find
alot of bugs
in the other components we were not able to see with our previous testing. We
needed to
-fix some of the protocol flows. We hope that we can finish the client as soon
as possible
+fix some of the protocol flows. We hope that we can finish the client as soon
as possible
since we also need to implement the authentication procedure and the command
line application.
\subsection*{Next Steps}
Implementation anastasis client tests and start working on the authentication
backend
@@ -138,7 +139,7 @@ Present at the Meeting were:"Dominik Meister, Dennis
Neufeld and Christian Groth
\subsection*{Reflection}
We continued the work on the anastasis client api and the authentication
backend,
we still found problems in the other components.
-To finish the anastasis client we will need the authentication backend. So we
decided to implement the most basic authentication, secure question.
+To finish the anastasis client we will need the authentication backend. So we
decided to implement the most basic authentication, secure question.
We also still have some issues with our naming conventions which are not
always clear.
\subsection*{Next Steps}
Finish implementation anastasis client tests and authentication backend
@@ -147,7 +148,7 @@ Finish implementation anastasis client tests and
authentication backend
Present at the Meeting were:"Dominik Meister, Dennis Neufeld and Christian
Grothoff".
\subsection*{Reflection}
We could finish the authentication backend and now need to implement the
client logic for the authentication.
-We also need to finish the client tests. We have roughly one month left to
finish the project, we started to
+We also need to finish the client tests. We have roughly one month left to
finish the project, we started to
think that we can't develop a complex authentication method. We planned that
we first will finish the rest
and afterwards look if we have time to implement a different authentication
method.
\subsection*{Next Steps}
@@ -165,8 +166,8 @@ Finish client api and tests
\section*{Meeting 14.05.2020}
Present at the Meeting were:"Dominik Meister, Dennis Neufeld and Christian
Grothoff".
\subsection*{Reflection}
-Something unexpected happened this week. We applied for funding last semester
and were rejected.
-But we were informed that we can still present our work. Therefore we have to
prepare a business
+Something unexpected happened this week. We applied for funding last semester
and were rejected.
+But we were informed that we can still present our work. Therefore we have to
prepare a business
pitch in the next few days. This will be quite stressfull since we are also
behind in our development.
\subsection*{Next Steps}
Prepare business pitch and finish client api
@@ -197,12 +198,12 @@ We already have a lot of documentation available which
needs to be put togheter
proposal we sent, we are very happy that we can continue our work on Anastasis
after the thesis.
Additionaly the Book and the poster are finished and we could deliver them.
\subsection*{Next Steps}
-Work on documentation
+Work on documentation
\section*{Meeting 04.06.2020}
Present at the Meeting were:"Dominik Meister, Dennis Neufeld and Christian
Grothoff".
\subsection*{Reflection}
-There is only one week left, our document is nearly finished. We discussed
which last sections need to be added. The thesis overall is now in a nearly
finished state, there are some minor problems with the illustrutions and the
text which should be easy fixed.
+There is only one week left, our document is nearly finished. We discussed
which last sections need to be added. The thesis overall is now in a nearly
finished state, there are some minor problems with the illustrutions and the
text which should be easy fixed.
\subsection*{Next Steps}
Fix illustrations, rework client client documentation
@@ -210,7 +211,7 @@ Fix illustrations, rework client client documentation
\section*{Meeting 08.06.2020}
Present at the Meeting were:"Dominik Meister, Dennis Neufeld and Christian
Grothoff".
\subsection*{Reflection}
-This is the second last meeting of our thesis. We discussed the last changes
which need to be done. The text is completed, we decided that we could add more
illustrations to give a better understanding of the document. We are very proud
of our work and think that we have done a good job.
+This is the second last meeting of our thesis. We discussed the last changes
which need to be done. The text is completed, we decided that we could add more
illustrations to give a better understanding of the document. We are very proud
of our work and think that we have done a good job.
\subsection*{Next Steps}
Add illustrion for key flow, rework some minor inconsitencies
@@ -218,11 +219,7 @@ Add illustrion for key flow, rework some minor
inconsitencies
Present at the Meeting were:"Dominik Meister, Dennis Neufeld and Christian
Grothoff".
\subsection*{Reflection}
We mainly discussed what still needs to be done in the Anastasis
documentation. We discovered that the related work
-has not enough details and needs some more work. Also in the business model
were some small problems. The work on
+has not enough details and needs some more work. Also in the business model
were some small problems. The work on
the documentation progresses very quick, it also has to since we dont have
much time left.
\subsection*{Next Steps}
Work on documentation
-
-
-
-
diff --git a/doc/thesis/thesis.tex b/doc/thesis/thesis.tex
index 8f19584..dbc2dad 100644
--- a/doc/thesis/thesis.tex
+++ b/doc/thesis/thesis.tex
@@ -63,13 +63,15 @@
\include{conclusion}
+\appendix
+\include{rest_api_documentation}
+\include{Journal}
+
+
%% Print the bibibliography and add the section to th table of content
\printbibliography[heading=bibintoc]
\newpage
\listoffigures
%\listoftables
-\appendix
-\include{rest_api_documentation}
-\include{Journal}
\end{document}
--
To stop receiving notification emails like this one, please contact
gnunet@gnunet.org.
- [taler-anastasis] branch master updated: do not repeat title slide,
gnunet <=