|
From: | Tristan Bereau |
Subject: | Re: [ESPResSo] integration steps |
Date: | Thu, 11 Nov 2010 13:29:07 -0500 |
User-agent: | Mozilla/5.0 (X11; U; Linux i686 (x86_64); en-US; rv:1.9.2.9) Gecko/20100915 Lightning/1.0b2 Thunderbird/3.1.4 ThunderBrowse/3.3.2 |
Hi Mikheil,It seems that [setmd time] will do the job (from the TCL interface). The corresponding C variable is 'sim_time' (look at global.c and integrate.c).
Best, Tristan On 11/11/2010 12:54 PM, Mikheil Azatov wrote:
Hi Espresso users,I wanted to ask if there is a variable in Espresso that has a value of time passed or number of integration steps passed. I'm implementing a Monte Carlo scheme inside the simulation( in forces_calc() in forces.c ) and I need to apply it only once in every N integration steps.Thanks, Mikheil Azatov University of Maryland _______________________________________________ ESPResSo mailing list address@hidden https://fias.uni-frankfurt.de/mailman/listinfo/espresso
[Prev in Thread] | Current Thread | [Next in Thread] |