Re: Staging freeze


From: Leo Famulari
Subject: Re: Staging freeze
Date: Wed, 4 Jan 2017 03:45:05 -0500
User-agent: Mutt/1.7.2 (2016-11-26)

On Fri, Dec 23, 2016 at 12:23:39AM -0500, Leo Famulari wrote:
> The last staging branch was merged into the master branch on December
> 11.
> 
> According to the 3 week staging cycle we are trying to adhere to [0],
> this would mean we freeze the current branch on December 25 and try to
> merge it on January 1.
> 
> These dates are inconvenient for many people. I propose we freeze the
> branch and start building on December 27, and try to merge on January 3.

Update:

We are having some issues with the armhf and mips64el build machines
that are keeping us from building all the packages.

Attachment: signature.asc
Description: PGP signature